“Week” view

The Calendar view in Outlook 2007 includes a new “Week” view. In the last edition of Outlook, the days are divided into two columns, similar to a traditional weekly diary. The new “Week” view is similar to the “Work week” views in previous versions.

The “Work Week” view on the calendar is selected by default.
This will show the days, for most of us Monday through Friday, is displayed in our calendar. But we can adjust it according to our needs. For example hairdressers, who work on Saturday but not Monday can make these changes.

les04_image01_en

Just click “Tools” in the menu bar and click “Options” in the drop-down menu.
In the dialog that appears, click the “Calendar Options” button.
This opens a second dialog work week window where we can set the “Start time” and the “End Time”.

If you work in the week from Tuesday to Saturday, then click the check box “Tue” and uncheck “Mon”, and check the “Sat”.

Click OK to close the dialog box and click OK again to close the first dialog box.

les04_image02_en

You can change to the “Month” view by selecting this option at the top of the calendar.
The “Low” option shows only events. An event in an item that has a start or end time that is set within a duration of one day.
The “Medium” appointments will be shown as a full bar, proportionate to the suration of the appointment.

And the “High” will show all appointments and events. Appointments are displayed with their Start/End time and their subject.

les04_image03_en

Awesome!
You've completed Lesson 4
START NEXT LESSON